TrafoSiteTestingTM

Verify the reliability of your transformers

ABB’s latest development the TrafoSiteTestingTM mobile test unit is a Mobile High-Voltage Test System for On-Site Testing of Power Transformers. Worldwide, it is the first 3-phase Mobile High-Voltage Test System for Power Transformers based on a static frequency converter which is especially designed for performing routine and special tests according to standards as IEC 60060-3, IEC 60076 and IEEE Std. C57.12.00.



Why should transformers be tested on site?
With TrafoSiteTestingTM, ABB proves the proper condition of the equipment, giving accurate and reliable test results as is known from acceptance test in a static test field in a factory. As an enhancement of ABB’s TrafoSiteRepair™ concept, the Mobile High-Voltage Test System opens new doors for condition assessment. Informed decision-making is fundamentally important. Values measured with the Mobile High-Voltage Test System and diagnosed and evaluated by ABB’s experts who have access to more than a century of knowledge in transformer manufacturing, is the basis for the optimal solution. Accurate information allows prioritizing service work in a way that ensures maximum economic benefit.

TrafoSiteTestingTM can be used:
  • After a TrafoSiteRepair of a transformer
  • After a failure for diagnosis and fault detection
  • For condition assessment on high-valued, important and critical units during maintenance shut-downs
  • Before the commissioning and energizing of spare transformers
  • After shipment of repaired or new transformers



    •   Cancel
      • Twitter
      • Facebook
      • LinkedIn
      • Weibo
      • Print
      • Email
    •   Cancel

    Your preferences:

    ABB contact for New Zealand

    Sales: Tony Wyatt
    Service: Tony Wyatt
    db0003db004283 125cad8e49a919a1c12578c700458d0a